| No | Kode Rincian | Uraian | Penerima | Rekening | Pembayaran | Sumber Dana |
|---|---|---|---|---|---|---|
| 1 | 5.3.7.03. | Belanja plafon PVC 30 m2 @ 220.000,- dan List plafon 15 m @ 47.500,- Atap Penghubung Joglo Pramuka. Nota terlampir | KURNIA Gypsum | - | 7.312.500 | PBP |
| 5.3.7.03. Belanja Modal Irigasi/Embung/Drainase/dll - Bahan Baku/Material (Sub Jumlah) : | 7.312.500 | |||||
| Total Keseluruhan: | 7.312.500 | |||||